19.12.5 Monitoring your optimization process

You can monitor the progress of your optimization process while it is running by selecting OptimizationMonitoroptimization process name. You can also monitor the optimization process by selecting the optimization process name in the Optimization Process Manager and clicking Monitor. The optimization process monitor appears, as shown in Figure 19–8

Figure 19–8 The optimization process monitor.

You can also view the monitor for the Abaqus jobs that completed during previous design cycles by clicking mouse button 3 on the job in the Model Tree and selecting Monitor.

To monitor the current Abaqus analysis job, click the Monitor button in the top right corner of the optimization process monitor. Abaqus/CAE displays the job monitor and continues to update the job monitor for each iteration of the optimization. If desired, you can terminate the Abaqus analysis job and, hence, the optimization process, from the job monitor. For more information, see Continuing an optimization process that terminated, Section 19.12.4, and Monitoring the progress of an analysis job, Section 19.2.6.

The optimization process monitor displays the following information:

An optimization process outputs a large amount of information to the optimization process monitor, especially to the Output File tabbed page. To help you locate a particular text string, you can use the Search Text fields in the lower half of the optimization process monitor. Select the desired file tab, enter a search string in the Text to find field, and click Next or Previous to step through the output from one hit to the next. Toggle on Match case to perform a case-sensitive search.

The information presented in the optimization process monitor is updated continually as the optimization progresses. If the optimization fails, the Errors tabbed page appears in front of the other tabbed pages automatically to help you determine the cause of the failure. In addition, an exclamation point appears on the tab if any error or warning messages are output.

If you start monitoring an optimization process and then either exit Abaqus/CAE, close the current model database, or open a new model database, the optimization process will continue; but, you will no longer be able to monitor the optimization process from Abaqus/CAE.


For information on related topics, click any of the following items: